Morocco: legal framework for power plants — Laws 13-09 / 82-21 and grid-connection approval
39baca3f-345e-4d8c-9796-7a40656f159c
In force
Issuing authority
—
Level
—
Effective date
Per the official text
Verification date
2026-08-12
Scope
—
Source
Official primary source (see link below)
• Law 13-09 governs renewable electricity production; Law 82-21 governs self-production of electricity. • The electricity regulator (ANRE) issues and publishes the decisions framing grid access and tariffs; approval of grid connection remains with the system operators. • Relevant technical reference: ANRE CRENT (grid-connection technical requirements) — frequency 47–52 Hz; transmission voltage 0.9–1.15 pu; THD ≤ 3%. • Official source: ANRE (https://anre.ma), including the official Bulletin Officiel text of Law 82-21 (BO 7400).
Official source
Facts in this record rely on an official primary source; texts may be amended, so refer to the official text and the latest Bulletin Officiel.
https://anre.ma/wp-content/uploads/2023/08/Loi-82-21-BO_7400_Fr.pdf ↗